smart-networks

PILLAR: SMART NETWORKS

Trinity

Data-Discovery-and-Cataloguing-e1687188784561

What we will do and why

Working with GE, PNDC and SSEN to explore the use of control room simulations to improve network resilience. The project will look to leverage existing approaches used in the generation and transmission sectors, applying the unique operational and commercial scenarios applicable to distribution environments.

This project is funded through the Strategic Innovation Fund, which works in three phases. If successful for a subsequent phase then the end date and other details will change.

Key deliverables

  • Simulator functionality deployed to UKPN and PNDC
  • Recommendations for simulator integration options with next generation ANM solutions
  • Updated cost benefit analysis

Target outcomes

  • Reduction in load related reinforcement savings and network operating costs
  • Efficient use of flexibility thus reducing over-procurement
  • Reduction in generation curtailment and fast connections

Measures of success

  • Increase in flexibility used in each substation
  • Decrease in required recruitment of FTEs in the control room
  • Progression of the innovation project from SIF Alpha to SIF Beta

Stakeholder Engagement

Engagement with control room systems engineers at SP Energy Networks and SSEN to capture requirements for a simulation environment. Future engagement with System Operators and Network Operators to refine user needs and inform future direction of simulator integration with ANM providers.

Public Detailed Docs

Planned start:

02.10.2023

Target completion:

31.03.2024

Key milestones:

  • Simulator and use case deployment at UK Power Networks (Mar 2024)
  • Simulator and use case deployment at PNDC (Mar 2024)
  • Customer and market analysis for ANM integration (Mar 2024)

Status:

On Track

Date of change Category Description
27.12.2023 Update

This was added to the DSAP in December 2023 as it was identified as a new strategic digital initiative since our first publication of the action plan in July 2023.